Autumn/Winter November and onwards 2017 deployment(s)
Re: Autumn/Winter November and onwards 2017 deployment(s)
Thanks for the debate, I've written to the manufacturers vis a vis non-submerged operation and am awaiting a reply.
Re: Autumn/Winter November and onwards 2017 deployment(s)
Hello
We were discussing a jobs to do list, here's my initial thoughts (with a broad brush):
River bed
• Clean river bed
• Identify and deal with leaks
• Maintain water levels
New Butt Farms
Rear of Lady Hanham building
3 groups of 5 barrels (2 groups at end of path, 1 group between Lady Hanham building and Model Railway building)
• Location
◦ Barrels
◦ Valves
◦ Controls
• Ground work / support structures
◦ Mortar concrete bloack in place
• Identify and purchase materials
◦ Pipework / joints
◦ Valves
◦ Trellis betwwen Lady Hanham building and Model Railway building
• Installation
Gazebo
1 Group of 5 barrels
• Install guttering
• Locations
◦ Barrels
◦ Valves
◦ Controls
◦ Intranet antenna
• Identify and purchase materials
• Installation
Trench
• Mark out route
• Clear existing gravel
• Dig trench
• Identify and purchase materials
◦ Pipe / joints
◦ Gravel
• Lay pipe / ethernet
◦ Pipe and ethernet cable laid in trench on bed of gravel and covered by gravel. Depth to be determined.
Rear of Wendy house
• Site for pump / valves / controls
• Location of Ethernet switch
• Identify and purchase hardware
• Installation
Sump
• Tidy up pumbing and sump house
• Identify and install new pump
• Add control for new pump (if different from old)
• Make new sump removable door to show off sump contents.
Sump control ‘Green” box
• Prepare and Paint
Hwyl
Penri
We were discussing a jobs to do list, here's my initial thoughts (with a broad brush):
River bed
• Clean river bed
• Identify and deal with leaks
• Maintain water levels
New Butt Farms
Rear of Lady Hanham building
3 groups of 5 barrels (2 groups at end of path, 1 group between Lady Hanham building and Model Railway building)
• Location
◦ Barrels
◦ Valves
◦ Controls
• Ground work / support structures
◦ Mortar concrete bloack in place
• Identify and purchase materials
◦ Pipework / joints
◦ Valves
◦ Trellis betwwen Lady Hanham building and Model Railway building
• Installation
Gazebo
1 Group of 5 barrels
• Install guttering
• Locations
◦ Barrels
◦ Valves
◦ Controls
◦ Intranet antenna
• Identify and purchase materials
• Installation
Trench
• Mark out route
• Clear existing gravel
• Dig trench
• Identify and purchase materials
◦ Pipe / joints
◦ Gravel
• Lay pipe / ethernet
◦ Pipe and ethernet cable laid in trench on bed of gravel and covered by gravel. Depth to be determined.
Rear of Wendy house
• Site for pump / valves / controls
• Location of Ethernet switch
• Identify and purchase hardware
• Installation
Sump
• Tidy up pumbing and sump house
• Identify and install new pump
• Add control for new pump (if different from old)
• Make new sump removable door to show off sump contents.
Sump control ‘Green” box
• Prepare and Paint
Hwyl
Penri
Re: Autumn/Winter November and onwards 2017 deployment(s)
Okay, sounds good. Should we put this in a new topic? That way we could modify the post as we go to keep up with what's been done and the new things that we'll inevitably add to the list
Hamish
Hamish
Hamish
Re: Autumn/Winter November and onwards 2017 deployment(s)
I think that isn't a bad idea. As well as modifying the list by additions and updates, we can also mark items as 'Done' to show progress.
Terry