- The five original water butts have been installed, plumbed, and tested behind a wendyhouse.
- Initial software for the Capacitive Probe, Resistance Probe, and Hall Effect Device was written.
- A capacitive probe has been built and is currently being tested/refined.
- A resistance probe has been built and deployed in a test installation by the sump.
- Clive has built a water wheel which will later have a hall effect device on it, and it is currently in place by the sump as a proof-of-concept.
Catching up with some old announcements
Catching up with some old announcements
Just posting some old announcements here that we never posted for the WMT River System:
Hamish