Integration To-do List - Started May 2020

Sub-forum to hold jobs lists
hamishmb
Posts: 1891
Joined: 16/05/2017, 16:41

Re: Integration To-do List - Started May 2020

Post by hamishmb »

Shall I create a new forum so we can discuss it? I can make you a quick mock-up if you like.
Hamish
TerryJC
Posts: 2616
Joined: 16/05/2017, 17:17

Re: Integration To-do List - Started May 2020

Post by TerryJC »

Yes. Keep it off here please. This Topic should only contain comments about the To-do List itself, not work to achieve the items on it.
Terry
hamishmb
Posts: 1891
Joined: 16/05/2017, 16:41

Re: Integration To-do List - Started May 2020

Post by hamishmb »

Done, new thread at viewtopic.php?f=14&t=220. If you link to it in the todo list we can then delete my replies to keep this space clean.
Hamish
Penri
Posts: 1284
Joined: 18/05/2017, 21:28

Re: Integration To-do List - Started May 2020

Post by Penri »

Hamish

For an iOS phone would be perfect, thank you.

Penri
Penri
Posts: 1284
Joined: 18/05/2017, 21:28

Re: Integration To-do List - Started May 2020

Post by Penri »

Hello

This morning I tackled the following:

Re-build Stage Butts barrel farm together with plumbing and reconnect to system.
Reintegrate the Stage Butts SAC removed when the Butts platform was replaced.
Reinstall the Stage Butts Gate Valve into the system - The Stage gate valve is physically installed in the water system, need to check electrical and control status. Plus it need the Stage Butts built and plumbed in to allow it to provide water.


As of lunchtime today the Stage Butts were re-assembled, plumbed in and partially filled with water to test for leaks, of which none were evident.
The Stage Butts SAC has been screwed to the fence, as before, and the depth probe, max/min float switch and Ethernet cable connectors plugged in and secured to the base of the SAC, I didn't plug in the 12V supply but it's coiled up ready to go.
IMG_5106.jpeg
IMG_5106.jpeg (2.03 MiB) Viewed 1272 times
IMG_5107.jpeg
IMG_5107.jpeg (2.59 MiB) Viewed 1272 times
The Stage gate valve is plumbed in but has no Ethernet or 12V supply connection as we were previously waiting for an instantiation of the Valve S/W to be prepared. I'll make off the cables for those connection tomorrow but hold off plugging them in.
TerryJC
Posts: 2616
Joined: 16/05/2017, 17:17

Re: Integration To-do List - Started May 2020

Post by TerryJC »

Penri's progress added.
Terry
Penri
Posts: 1284
Joined: 18/05/2017, 21:28

Re: Integration To-do List - Started May 2020

Post by Penri »

Hello

As of lunchtime today, in respect to:
Reinstall the Stage Butts Gate Valve into the system. The Stage Butts Gate Valve is plumbed in but has no Ethernet or 12V supply connection as we were previously waiting for an instantiation of the Valve S/W to be prepared. Penri will make off the cables for those connection tomorrow but hold off plugging them in.

Cables made; Ethernet connected to patch panel connector 13 and 12V dc cable wired into dc distribution block. Valve end connectors of both cables bagged and placed in valve assembly ready for connection.

Install the V1 Gate Valve behind Lady Hanham Building.
Install the V2 Gate Valve behind Lady Hanham Building.
Install the V3 Gate Valve behind Lady Hanham Building.


All 3 gate valves installed in water system and electrical connection made to Hanham SAC box, which is currently not powered up. All valves manually opened and left in that state. Water butts partially filled to check for leaks, none evident.
IMG_5114.jpeg
IMG_5114.jpeg (1.88 MiB) Viewed 1266 times
IMG_5115.jpeg
IMG_5115.jpeg (2.56 MiB) Viewed 1266 times
IMG_5116.jpeg
IMG_5116.jpeg (2.5 MiB) Viewed 1266 times
Hwyl

Penri
TerryJC
Posts: 2616
Joined: 16/05/2017, 17:17

Re: Integration To-do List - Started May 2020

Post by TerryJC »

To-do List Updated.
Terry
hamishmb
Posts: 1891
Joined: 16/05/2017, 16:41

Re: Integration To-do List - Started May 2020

Post by hamishmb »

Just noting that we do indeed want to update Raspbian on the SD cards.
Hamish
TerryJC
Posts: 2616
Joined: 16/05/2017, 17:17

Re: Integration To-do List - Started May 2020

Post by TerryJC »

hamishmb wrote: 12/05/2020, 17:26Just noting that we do indeed want to update Raspbian on the SD cards.
Added to the list.
Terry