Preliminary activity

Posted: 15/03/2020, 21:38
by Penri
These posts cover the initial work being done to provide a 12V dc infrastructure to WMT model buildings.

Details will be added and updated as they become available.
South side schematic v01.odg
(24.5 KiB) Downloaded 88 times

Re: Preliminary activity

Posted: 28/03/2020, 13:46
by Penri
Attached are two photographs relating to the WMT building lighting activity

One shows the 12V distribution box located next to the fence near the WMT Wesleyan Chapel. This photograph was taken before the cables were routed via the underground ducts to the various points of need.
IMG_4782.jpeg
IMG_4782.jpeg (597.41 KiB) Viewed 884 times


The other is of the PSU, Voltmater/Ammeter and fused distribution assembly all mounted on a plywood base ready for insertion into the box. The photographs also shown 2off 12V 10W flood lights being used as loads for test purposes.
IMG_4871.jpeg
IMG_4871.jpeg (400.49 KiB) Viewed 884 times

Re: Preliminary activity

Posted: 28/03/2020, 22:41
by Penri
Update description document.
South side schematic v02.odg
(479.85 KiB) Downloaded 89 times

Re: Preliminary activity

Posted: 19/06/2020, 12:22
by Penri
Progress since last posting.

Distribution board installed in box:
IMG_4934.jpeg
IMG_4934.jpeg (1.95 MiB) Viewed 830 times
Wesleyan Chapel wired in:
HDR Front 2_DxOVP.jpeg
HDR Front 2_DxOVP.jpeg (138.48 KiB) Viewed 830 times
more information to follow on lighting in Chapel

... and Ian as complete re-lighting and re-wiring all the dioramas, example of how work:
IMG_5312.jpeg
IMG_5312.jpeg (2.54 MiB) Viewed 830 times
... he even drilled up through the candlestick to insert a seriously small led! I think it looks fabulous.


More soon.