After a suggestion to improve access, the Board containing the Raspberry Pi and interfacing electronics has been moved and is now accessible from the front of the layout behind the green cloth.
It has been suggested that the six warm-up runs every 10 mins are now unnecessary since the motor has been changed in the engine. This work will be carried out at a convenient point in the coming weeks, depending on workload in other projects.
Ongoing Maintenance - Spring 2020 and Beyond
Return to “WMT Underground Railway”
Jump to
- Getting Started
- Maintenance Announcements
- Project Announcements
- WMT Site-wide Projects
- ↳ VPN Server
- ↳ WMT Building Lighting
- WMT River System
- ↳ Integration
- ↳ River System Status
- ↳ Jobs Lists
- ↳ Meeting Discussion
- ↳ Hardware Discussion
- ↳ Software Discussion
- ↳ NAS Box
- ↳ NAS Documentation
- ↳ NAS System Info
- ↳ General Software Improvements
- ↳ Design
- ↳ Requirements
- ↳ Canford School Projects
- ↳ Mobile Visitor GUI
- ↳ Design
- ↳ Requirements
- Tiny-TV
- WMT Minster Bells Re-engineering
- ↳ Design
- ↳ Requirements
- ↳ Software
- Railway Room Sound Effects Player
- 2019 Industrial Railway line - Milk Shake Factory
- ↳ Requirements
- ↳ Documentation
- ↳ Software
- ↳ Integration
- ↳ Hardware
- WMT Underground Railway
- ↳ Requirements
- ↳ Documentation
- ↳ Software
- ↳ Integration
- ↳ Hardware
- Loos Sound Effects
- ↳ Requirements
- ↳ Documentation
- ↳ Software
- ↳ Integration
- ↳ Hardware
- WMT Audio Guide and Town Quiz Web Server System
- WMT Minster Bells System
- WMT Model Railway Lighting System