I have made a start on building the second Gate Valve and also begun kitting for four more for the Matrix Pump.
I identified some shortages wrt inductors and capacitors, so have ordered 10 additional ferrite bead inductors (each Gate Valve needs 1 and the remaining two Pi Interfaces (Lady Hanham and Gazebo will also need one each)). I am also short of 10 nF capacitors (although I have enough for the initial build of the Stage Butts valve), so I tried to order some more (see https://uk.rs-online.com/web/p/products/1335715/, but RS are currently out of stock and not even taking back orders at present. These are what I used to suppress the spikes from the Actuator Motor and I know they work, so I'd rather stick to these. I tried elsewhere, but 10 nF 50 V ceramic capacitors are quite expensive compared to RS anyway.
None of this is a problem yet, and I can certainly continue with the build of the 2nd valve with what I have, but it will need to be resolved before we get onto building the Matrix Valve.
Penri,
I will need an Actuator Assembly to complete the work.
I identified some shortages wrt inductors and capacitors, so have ordered 10 additional ferrite bead inductors (each Gate Valve needs 1 and the remaining two Pi Interfaces (Lady Hanham and Gazebo will also need one each)). I am also short of 10 nF capacitors (although I have enough for the initial build of the Stage Butts valve), so I tried to order some more (see https://uk.rs-online.com/web/p/products/1335715/, but RS are currently out of stock and not even taking back orders at present. These are what I used to suppress the spikes from the Actuator Motor and I know they work, so I'd rather stick to these. I tried elsewhere, but 10 nF 50 V ceramic capacitors are quite expensive compared to RS anyway.
None of this is a problem yet, and I can certainly continue with the build of the 2nd valve with what I have, but it will need to be resolved before we get onto building the Matrix Valve.
Penri,
I will need an Actuator Assembly to complete the work.
Terry
Re: 2nd and Subsequent Gate Valve Construction
Terry
I can take one to WMT whenever you want but will definitely be there myself tomorrow (Tuesday) morning with one in my bag.
Penri
I can take one to WMT whenever you want but will definitely be there myself tomorrow (Tuesday) morning with one in my bag.
Penri
Re: 2nd and Subsequent Gate Valve Construction
Terry
I delivered a couple of assembled gate valves to WMT this morning, they are on the workbench in the poly tunnel.
Penri
I delivered a couple of assembled gate valves to WMT this morning, they are on the workbench in the poly tunnel.
Penri
Re: 2nd and Subsequent Gate Valve Construction
At WMT last Tuesday and in subsequent emails to Penri, I rashly suggested that I would have a Gate Valve finished to put into the Stage Butts output pipe by Tuesday.
It's still possible, but I've had a few setbacks (nothing to do with the Valves). First I had a domestic maintenance issue on Thursday, which ended up taking all day. Then on Friday, I developed a really nasty cough and it has steadily got worse since then. I'm pretty sure I caught it from my mother while she was down the week befor ppe last; if so, I don't expect to get over it anytime soon because she has only just shook it off.
Having said that, I think I will have a completed valve by Wednesday, but I think the opportunity to deploy may well have passed by then. We also need Hamish's new Software Framework and he feels that a bit more time would be beneficial.
Since both Penri and Hamish are on holiday next week, it looks as if it may take a week or so before we can install the new valve. The good news is that I should have five completed valves by then.
It's still possible, but I've had a few setbacks (nothing to do with the Valves). First I had a domestic maintenance issue on Thursday, which ended up taking all day. Then on Friday, I developed a really nasty cough and it has steadily got worse since then. I'm pretty sure I caught it from my mother while she was down the week befor ppe last; if so, I don't expect to get over it anytime soon because she has only just shook it off.
Having said that, I think I will have a completed valve by Wednesday, but I think the opportunity to deploy may well have passed by then. We also need Hamish's new Software Framework and he feels that a bit more time would be beneficial.
Since both Penri and Hamish are on holiday next week, it looks as if it may take a week or so before we can install the new valve. The good news is that I should have five completed valves by then.
Last edited by TerryJC on 14/07/2019, 20:19, edited 2 times in total.
Terry
Re: 2nd and Subsequent Gate Valve Construction
Thanks for the update, I'll do the necessary plumbing revisions early this coming week to accommodate the Stage Butts gate valve.
Re: 2nd and Subsequent Gate Valve Construction
Completed a little re-plumbing this morning.
Prepared locations for installation of the Stage Gate Valve:
This necessitated the relocation of the Stage butts ball valve:
Prepared locations for installation of the Stage Gate Valve:
This necessitated the relocation of the Stage butts ball valve:
Re: 2nd and Subsequent Gate Valve Construction
Terry
Would you like to add the connectors shown in the attached to the gate valve assembly; they are keyed, waterproof, good for 8A and I have around 20 pairs available.
It would save having to crawl on ones belly to connect the 12V supply to the valve assemblies, or at least save Hamish the job!
Penri
Would you like to add the connectors shown in the attached to the gate valve assembly; they are keyed, waterproof, good for 8A and I have around 20 pairs available.
It would save having to crawl on ones belly to connect the 12V supply to the valve assemblies, or at least save Hamish the job!
Penri
- Attachments
-
- IMG_3868.jpeg (1.18 MiB) Viewed 1322 times
Re: 2nd and Subsequent Gate Valve Construction
Sounds like a plan. Can you leave five in the W/S with the other four cases? If I'm in tomorrow, I'll pick them up.
We could also use them on the Pi Interfaces and free up a couple of TB pins to accommodate the new Float Switch..
We could also use them on the Pi Interfaces and free up a couple of TB pins to accommodate the new Float Switch..
Terry
Re: 2nd and Subsequent Gate Valve Construction
The connectors will be with me tomorrow, I just have to remember to leave them in the workshop.