I have therefore updated the Overall System Configuration diagram (see attached) to better reflect the way the system is shaping up. In this diagram I have made the following changes:
- Page 1 remains virtually unchanged apart from the addition of X-refs.
- Page 2 has the following changes:
- The pipe from the Railway Room Butts Farm now shows a Ball Valve and a Gate Valve at the Wendy Street end - as per the work we commenced this morning.
- The pipe from the Stage Butts now shows the Ball Valve and a Gate Valve at the Wendy Street end - as per the work we commenced this morning.
- The pipe to and from the RHS of the Pump matrix now goes straight to the Sump as discussed this morning.
- The pipe from the Wendy Street Butts now shows the Ball Valve and Gate Valve upstream from the junction with the Pump inlet/outlet - as discussed this morning.
- Minor layout changes to clarify the arrangement.
- Page 3 has an addtional Note to clarify the means by which water will be moved.
- Page 4 shows the Power and Ethernet arrangements now that it has been decided to drop PoE for the Wendy Street Butts Pi.