Summary of meeting 12/9/2017

A forum for discussing/summarising the meetings we hold at WMT. Also a good place for general discussion.
Post Reply
hamishmb
Posts: 1891
Joined: 16/05/2017, 16:41

Summary of meeting 12/9/2017

Post by hamishmb »

Hi,

Here's a brief summary, but let me know if anything is missing.

We talked about:
  • Software design documentation.
  • When we would like to deploy our software/hardware.
  • Penri's new magnetic levels probe.
  • Terry's second interface board for buttspi (to replace the multiple boards there at the moment).
  • Software and hardware design to integrate with the new probe.
We decided:
  • That we will not be using the resistance probe in our deployment as it is too unreliable.
  • We will move most of the circuitry into waterproof boxes.
  • Terry will make a new interface board for buttspi (not required for deployment).
  • I will add support for the magnetic levels probe in the software.
  • As Terry won't be able to work much on the project next week, we will try to deploy in two weeks time (around 26/9/2017).
We also discussed some more long-term stuff, but it was essentially just chat rather than making firm decisions, so not posted here.

Hamish
Last edited by hamishmb on 20/09/2017, 8:35, edited 1 time in total.
Hamish
TerryJC
Posts: 2616
Joined: 16/05/2017, 17:17

Re: Summary of meeting 12/9/2017

Post by TerryJC »

hamishmb wrote:
  • Terry will make a new interface board for buttspi (?)
  • As Terry won't be able to work much on the project next week, we will try to deploy in two weeks time (around 26/9/2017).
Minor clarification. I will make a new Interfacing Board, but not necessarily in time for the projected deployment date. If it isn't finished in time, I will refit the existing buttspi installation as an interim measure.
Terry
hamishmb
Posts: 1891
Joined: 16/05/2017, 16:41

Re: Summary of meeting 12/9/2017

Post by hamishmb »

Okay
Hamish
Post Reply