Catching up with some old announcements

Used to announce major milestones for WMT projects.
Post Reply
hamishmb
Posts: 1891
Joined: 16/05/2017, 16:41

Catching up with some old announcements

Post by hamishmb »

Just posting some old announcements here that we never posted for the WMT River System:
  • The five original water butts have been installed, plumbed, and tested behind a wendyhouse.
  • Initial software for the Capacitive Probe, Resistance Probe, and Hall Effect Device was written.
  • A capacitive probe has been built and is currently being tested/refined.
  • A resistance probe has been built and deployed in a test installation by the sump.
  • Clive has built a water wheel which will later have a hall effect device on it, and it is currently in place by the sump as a proof-of-concept.
Hamish