Major Stage of Deployment Completed

Used to announce major milestones for WMT projects.
Post Reply
TerryJC
Posts: 2616
Joined: 16/05/2017, 17:17

Major Stage of Deployment Completed

Post by TerryJC »

With the completion of the integration of:
  • The new Sump Pi Interface.
  • The new gate Valve Assembly.
  • The new Wendy Street Butts Pi Interface.
into the system, a major stage of the deployment has been completed.

These developments represent the completion of the prototyping stage for all the current sensor types (Float and Hall Effect 2), the interfacing assemblies to utilise them and the Gate Valves that will eventually be controlling the flow of water all over the site.

There is no doubt that there will be a need for some further development going forward, but this stage represents the completion of the main components and much of the future work will be 'production' of similar devices, built (largely) to the same design.

Big pats on the back all round :D
Terry