Spring / Summer April 2018 and onwards deployment(s)

Acts as an interface between the other forums here. Used to coordinate overall direction of the project.
TerryJC
Posts: 2616
Joined: 16/05/2017, 17:17

Re: Spring / Summer April 2018 and onwards deployment(s)

Post by TerryJC »

Excellent! I look forward to putting it all together on Tuesday.
Terry
Penri
Posts: 1284
Joined: 18/05/2017, 21:28

Re: Spring / Summer April 2018 and onwards deployment(s)

Post by Penri »

OK there's an update on how things stand at the end of play on the 31Aug18.
  • The pipework behind the Wendy House to the Wendy Street stage barrels and Hanham building MDPE (blue) pipes is complete with a temporary link around where the pump will be (see photographs attached).
  • Holes have been drilled in the top of the Wendy Street stage barrels; filter material has been procured, cut and fitted; and the down pipe feed from the stage gutter cut and diverted to suit (all we need now is some rain to see if it all works as planned).
  • A design for a bracket to hold the linear actuator and gate valve has been produced and is out with a fabricator for estimating.
  • A design for a coupling between the linear actuator and the gate valve has been produced and 3D printed samples manufactured for trial purposes.
  • Plumbers Mait has been applied to the piping connecting to the 3D printed join behind the Wendy house, this join needs monitoring.

Hwyl

Penri
Attachments
IMG_2323.jpg
IMG_2323.jpg (3.03 MiB) Viewed 786 times
Penri
Posts: 1284
Joined: 18/05/2017, 21:28

Re: Spring / Summer April 2018 and onwards deployment(s)

Post by Penri »

... further photos.
Attachments
IMG_2324 5.jpg
IMG_2324 5.jpg (3.9 MiB) Viewed 785 times
Penri
Posts: 1284
Joined: 18/05/2017, 21:28

Re: Spring / Summer April 2018 and onwards deployment(s)

Post by Penri »

... and the last one
Attachments
IMG_2325 5.jpg
IMG_2325 5.jpg (3.2 MiB) Viewed 785 times